Induction Heating Power Supply--Safety Operation Guide


1. Before starting the machine, first check whether the water, gas and electricity are connected. After connecting, the following operations can be performed;

2. The operator must prepare corresponding insulating shoes, gloves, etc.

3. The operator must have the corresponding electrical knowledge.

4. Before the equipment is overhauled, the electric switch must be pulled off to confirm that the power supply is disconnected, and then the discharge treatment is carried out, and then the overhaul card is hung up, and the overhaul is repeated.

5. Before starting the machine, first make sure that the waterway is normal and all parts of the equipment are normal before starting the machine.

6. Turn on the first gear filament first, then turn on the second gear filament after five minutes, and then send the high voltage after another five minutes.

7. Before sending high voltage, make sure that the output adjustment potentiometer is in a small position, and then send high voltage, and adjust the output voltage to the working voltage.

8. After confirming that there is a workpiece, you can press the heating button to make the equipment work, but no-load heating is not allowed.

9. If there is an abnormality in the equipment during work, the power supply must be disconnected immediately, and the reason should be checked before working again.

10. After the equipment is finished working, first disconnect the heating, then disconnect the high voltage, then turn off the filament and disconnect the power supply.

11. After the equipment stops working, wait for five minutes before disconnecting the water source.

12. During the operation of the equipment, if there is a temporary need to leave, it must be done. People leave the machine and stop it. It is not allowed. The machine is still working when there is no one.


weekly maintenance

1. When taking over the shift, check the flow of the cooling water outlet pipe of the equipment for abnormal phenomena. For equipment that uses evaporative cooling tubes, it is necessary to check whether the water level of the distilled water tank is qualified;

2. When taking over, check whether the cooling air volume of the glass shell and core column of the electronic tube and other ventilation and heat dissipation facilities are normal;

3. Check whether the contacts of each AC contactor are ablated and whether the wiring is loose;

4. Measure the insulation resistance of cooling water. The ground resistance of the anode of the water-cooled tube should be greater than 300K ohms;

5. The cooling water pipes of the electronic tube grid and the filament are mostly rubber tubes, which are easy to age and should be carefully checked. For the rubber tube that is aging and about to break, it should be updated in time;

6. Do a cleaning and dust removal on the inside of the chassis, wipe off the dust of each high-pressure porcelain bottle and insulating pillars, and pay attention to the cleaning of the dust filter on the air inlet of the fan. Prevent the air intake from being blocked and reduce the air output.


Semi-annual maintenance

1. Check whether the insulation performance of the low-voltage electric control circuit is qualified;

2. Use a megohmmeter to detect the insulation resistance of high-voltage devices such as high-voltage rectifier transformers, high-voltage cables, and high-voltage silicon stacks, and the value should meet the requirements;

3. Check the roundness of the inner tube of the water jacket of the electronic tube and the height of the positioning protrusion, so as to prevent the partial overheating of the anode caused by the deviation of the tube. And check whether there is scaling at the water jacket outlet and inlet pipe joints, and whether the anti-corrosion electrode is normal; 4. Check the set current value of each overcurrent relay;

5. For connecting conductors with high temperature during operation, such as filament lead wires, soft connecting wires for welding transformer primary coils, etc., if there is poor oxidation contact, additional treatment should be made;

7. Thoroughly clean the hidden places such as the top of the cabinet and the cable trench.


Link to this article:http://www.aclear.cn/en/product/product20181026142.html
Previous:NO!
Next:NO!

Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 无码人妻精品中文字幕| 国产人妖ts一区二区| 把女邻居弄到潮喷的性经历 | 国产精品尹人在线观看| 99精品无人区乱码1区2区3区| 色婷婷亚洲婷婷八月中文字幕| 亚洲性色av性色在线观看| 日本道色综合久久影院| 熟女性饥渴一区二区三区| 国产超碰av人人做人人爽| 日本中文字幕一区不卡在线| 国产丝袜免费精品在线一区| 全部孕妇毛片丰满孕妇孕交 | 97亚洲欧美国产网曝97| 一边吃奶一边添p好爽故事| 曰批免费视频播放免费| 人人妻人人澡欧美一区二区三区| 久久久久亚洲精品无码蜜桃| 亚洲亚洲中文字幕无线码| 99久久精品国产一区二区| 在线不卡日本一区二区视频| 日本道色综合久久影院| 天堂中文最新版在线中文| 一区二区三区另类图片| 色综合天天综合高清网国产在线 | 一区二区三区色精品视频| 欧美性开放情侣网站| 国产精品久久久久久久久久久久| 人妻少妇被粗大爽.9797pw| 国产丝袜高跟一区二区91| 日韩av一区免费观看| 亚洲区成人综合一区二区| 不卡一卡二卡三乱码免费网站| 黄色一区二区在线观看| 国产92成人精品视频免费| 激烈的性高湖波多野结衣| 2024av天堂手机在线观看| 国产综合成人亚洲区| 国产精品人妻系列21p| 亚洲第一区第二区在线观看| 国产精品r级最新在线观看|