精品国产乱码一区二区99|亚洲综合无码一区二区三区|成在人线av无码免费高潮求绕|国产草草影院ccyycom|国产精品va尤物在线观看

Current Location:Home > Product > Steel wire annealing > Aluminum bar forging furnace

2020-07-20 17:48:44

Share
  • Share to WeChat Moments

Round steel forging diathermy equipment

  • Description

圖片012.png

Operation steps of round steel forging diathermy equipment and bar diathermy forging equipment

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of round steel forging diathermy equipment and bar diathermy forging equipment

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg


Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 又嫩又硬又黄又爽的视频| 漂亮人妻被中出中文字幕久久| 国产又黄又爽无遮挡不要vip| 深爱婷婷国产在线精品av| 自拍视频在线观看一区99| 色偷偷av男人的天堂| 少妇又紧又色又爽又刺激视频 | 欧洲美妇乱人伦视频网站| 国产精品国产精品国产专区不卡 | 亚洲无免费在线观看一区二区 | 大狠狠大臿蕉香蕉大视频| 奇米精品一区二区三区在线观看| 免费的国产精品一区二区不卡视频| 2020久久天天躁狠狠躁夜夜| 国产超碰人人做人人爱ⅴa | 国产手机在线亚洲精品观看| 欧美日激情日韩精品嗯| 少妇白浆高潮无码免费区| 国产精品无码人妻在线| 国产一区二影院| 色哟哟一区二区三区四区五区六区| 久久天天躁狠狠躁夜夜免费观看 | 中文字幕av伊人av无码av狼人| 中国凸偷窥xxxx自由视频妇科 | 国产重口老太和小伙| 人妻少妇无码精品视频区| 高清一区二区三区日本久| 无码中文人妻在线一区二区三区| 法国啄木乌av片在线播放| 国产精品99久久久久久人| 亚洲国产一区二区三区亚瑟 | 精品国精品自拍自在线| 国产在线精品99一卡2卡| 久久996re热这里只有精品无码 | 亚洲国产成人精品青青草原导航| 亚洲三级一区二区视频| 超碰国产精品久久国产精品99| 老熟女五十路乱子交尾中出一区 | 好男人社区影院www| 欧美亚洲激情一区二区| 超级碰97直线国产免费公开|