精品国产乱码一区二区99|亚洲综合无码一区二区三区|成在人线av无码免费高潮求绕|国产草草影院ccyycom|国产精品va尤物在线观看

Current Location:Home > Product > IF induction series > Silicon controlled medium frequency forging furnace

2020-07-21 16:25:04

Share
  • Share to WeChat Moments

Infrared temperature measurement forging furnace

  • Description

Operation steps of infrared temperature measurement forging heating furnace

1) Passing water: Start the water pump and observe whether the water flow at the water outlet is normal.

2) Power on: first close the knife, then turn on the air switch at the back of the machine, and then turn on the power switch on the control board.

3) Setting: Select the operation mode (full automatic, semi-automatic, manual and foot control) according to your needs. When automatic and semi-automatic control, you need to set the heating time, holding time and cooling time (each time cannot be set to 0, otherwise it will not work properly). automatic cycle). Before using it for the first time and before you are proficient, you should use manual or foot control.

4) Startup: Before each start, the heating power potentiometer should be adjusted to the minimum as much as possible, and then slowly adjust the temperature to the required power after starting. Press the start button to start the machine, at this time the heating indicator on the panel is on, and there will be a sound of normal work and the simultaneous flashing of the work light.

5) Observation and temperature measurement: During the heating process, visual inspection is mainly used to determine when to stop heating based on experience. Inexperienced operators can use a thermostat to detect the temperature of the workpiece.

6) Stop: When the temperature reaches the requirement, press the stop button to stop heating. You can start it again after replacing the workpiece.

7) Shutdown: The machine can work continuously for 24 hours. The power switch should be turned off when not in use, and the knife or the air switch behind the machine should be turned off when not in use for a long time. When shutting down, the power should be cut off first and then the water should be cut off, so as to facilitate the heat dissipation inside the machine and the heat of the induction coil. Note: The machine should not work without load as much as possible, let alone run without load for a long time, otherwise, it will affect the performance and stability of the machine!


Maintenance of Forging Furnace with Infrared Temperature Measurement

When used in places with poor air environment, dust should be prevented from entering the inside of the machine, and water must not be splashed into the machine. To keep the cooling water clean, change it regularly. High temperature environment should maintain air circulation.

高頻10.jpg



Recommended Products

HOME About Us Product News Case Video Advantages Contact
主站蜘蛛池模板: 美女视频黄频a免费| 天天躁日日躁狠狠躁av中文| 久久亚洲道色宗和久久| 亚洲色成人网站www永久小说| 少妇人妻av毛片在线看| 99久久国产热无码精品免费| 日韩一区二区视频在线免费看| 一区二区婷婷综合| 亚洲人成影院在线观看| 在线欧美精品一区二区三区| 动漫高h纯肉无码视频在线观看 | 亚洲欧美黑人深喉猛交群| 国产成人无码精品久久久小说| 欧美日韩一区二区三区四区蜜桃视频| 国产日韩欧美视频一区二区在线播放 | 亚洲婷婷综合色高清在线| 寂寞少妇做spa按摩无码| 日本人成网站18禁止久久影院| 国产麻豆一区二区三区精品| 久久亚洲国产成人精品性色| 丁香五月亚洲中文字幕| 国产做爰xxxⅹ久久久精华液| 美女视频一区二区在线看| 超薄肉色丝袜一区二区| 亚洲男人av天堂一区二区综合| 亚洲欧美日韩成人一区在线| 777亚洲精品乱码久久久久久| 国产成人无码精品久久涩吧 | 国产色精品vr一区二区| 国产精品999一区二区| 国产小受呻吟gv视频在线观看| 亚洲性色av日韩在线观看| 亚洲精品9999久久久久无码| 午夜视频体内射.com.com| 亚洲日韩一区精品射精| 国产一区免费网站观看| 精品国产一区二区三区四区精华液| 亚韩精品中文字幕无码视频| 亚洲国产精品久久人人爱| 人妻丰满熟妇a无码区| 无遮挡又爽又刺激的视频|